Road maintenance projects

Each year, the county completes maintenance work to keep the road surface in good repair, to extend the life of the pavement and take care of roadway assets.

Larger scale projects, as well as the county's reconstruction and reconditioning projects, are posted annually.

General overviews and a list of paving projects and other active maintenance are listed below. You are encouraged to check this page regularly to get the most accurate list of upcoming projects.

Crews also may be working alongside the road throughout the year on activities like mowing, striping, signal painting, guardrail repairs, sign and signal improvements, as well as inspecting bridges.

Other road projects and projects near roads in your area may be led by the Minnesota Department of Transportation, your local municipality or various utility companies.

We thank county residents for their patience during the construction season and for being safe around work zones and crew members.

Open all

The county monitors the pavement condition on county roads and creates an annual list of projects best suited for repaving. These mill and overlay projects are substantially shorter than a full reconstruction of a road, typically lasting only a few days to a couple of weeks, and do not require full closures or detours.

Our 2021 list of repaving projects:

Bloomington

  • Old Shakopee Road (County Road 1) between Kell and Drew avenues
  • France Avenue (County Road 17) between Old Shakopee Road (County Road 1) and Pebblebrook Drive

Bloomington and Richfield

  • Penn Avenue (County Road 32) between American Boulevard West and 75th Street

Brooklyn Park

  • Zane Avenue (County Road 14) between Brooklyn Boulevard (County Road 152) and the bridge over Highway 610
  • 85th Avenue (County Road 109) between Highway 169 and Zane Avenue (County Road 14)
  • Brooklyn Boulevard (County Road 152) between County Road 130/County Road 103 and Brunswick Avenue

Eden Prairie

  • Pioneer Trail (County Road 1) between Juniper Lane and the bridge over Highway 169

Eden Prairie/Minnetonka

  • Baker Road (County Road 60) between Martin Drive and the bridge under I-494

Maple Grove

  • Zachary Lane (County Road 102) between 101st and 109th avenues

Medina

  • Arrowhead Drive (County Road 118) between Prairie Drive and Highway 55

Minnetonka

  • Shady Oak Road (County Road 61) between Cottage Lane and Minnetonka Boulevard (County Road 5)

Minnetrista/Independence

  • County Road 92 between Highway 7 and Watertown Road (County Road 6), includes twelve culvert replacements and one cattle pass removal

New Hope

  • Winnetka Avenue (County Road 156) between 36th and 42nd avenues

Richfield

  • Penn Avenue (County Road 32) between 66th Street (County Road 53) and the bridge over Highway 62

There are multiple ways we provide a smoother surface and reduce or eliminate issues that may lead to additional, more costly pavement repairs. These projects vary depending on the type of work needed to extend the lifespan of the pavement. They can be completed with minimal traffic impacts, but have immediate and long-lasting effects.

Our 2021 list of pavement resurfacing projects:

Brooklyn Park

  • Noble Parkway (County Road 12) between the bridge over Highway 610 and 109th Avenue
  • Brooklyn Park/Champlin
  • Zane Avenue/Douglas Drive (County Road 14) between the bridge over Highway 610 and 110th Avenue

Crystal/Robbinsdale

  • Bottineau Boulevard (County Road 81) between 36th Avenue and the bridge over CP Rail

Eden Prairie

  • Mitchell Road/Baker Road (County Road 60) between Fairway Drive and northern city limits 

Independence

  • Watertown Road (County Road 6) between the west county line and County Road 92

Independence/Minnetrista/St. Bonifacius

  • Main Street (County Road 92) between Highway 7 and County Road 6

Maple Grove

  • 93rd Avenue (County Road 30) between the bridge over I-94 and Forest View Lane

Minnetonka

  • County Road 101 between Hutchins Drive and Ridgewood

We continue to update all intersections within the county system in accordance with our Americans with Disabilities Act (ADA) Transition Plan.

These projects typically take about a week to complete.

Our 2021 pedestrian crossing and/or Accessible Pedestrian Signal (APS) upgrade projects are:

Bloomington

  • Penn Avenue (County Road 32) at:
    • 79th Street
    • American Boulevard
    • Brooklyn Park
  • 85th Avenue N (County Road 109) at:
    • Xylon Avenue
    • Wyoming Avenue
    • 85th Court
    • Sumter Avenue
    • Maplebrook Parkway
    • Mall entrance
    • Idaho Avenue
    • Hampshire Lane
    • Douglas Drive
    • Brunswick Avenue
    • Adair Avenue
  • Brooklyn Boulevard (County Road 152) at:
    • Kentucky Avenue
    • Hampshire Avenue
    • Georgia Avenue
    • Tessman Drive
    • Douglas Drive
    • Shingle Creek Drive
    • Brunswick Avenue

Eden Prairie

  • Multiple locations between Fairway Drive and I-494

Richfield

  • Penn Avenue (County Road 32) at:
    • 75th Street
    • 76th Street
    • 78th Street
  • Nicollet Avenue (County Road 52) at:
    • 72nd Street

New Hope

  • Winnetka Avenue (County Road 156) at:
    • Terra Linda Drive

St. Bonifacius

  • Kennedy Memorial Drive (County Road 92) at:
    • Wildwood Drive