Our final design includes safety improvements on Mill Street/Powers Boulevard for people that walk, bike, and roll. These improvements include:
- A shared-use path along the east side of Mill Street
- A button-activated flashing light at 3rd Street in Excelsior to make crossing the road safer for people accessing the regional trail
We are also repaving the road with one lane of traffic in each direction, adding four-foot paved shoulders in Chanhassen and Shorewood, replacing curbs and gutters, and updating the storm sewer design to improve drainage on Mill Street/Powers Boulevard.
Utilities
We are working with both private utility companies and city utility services to address any conflicts with the proposed design. We will relocate many utility poles on the east side of the road to the future grass boulevard between the trail and road.
Tree removals
While working to reduce tree impacts as much as possible, we will need to remove some trees for the project. Tree removals will begin in winter 2025-2026 ahead of construction in spring 2026.